G E N E R A L
News-
Photos-
Awards-
Outreach-
Animation-
Movies-


G U E S T S
Information-
Press Releases-
Links-

M E M B E R S
Directory-
Documents-
Schedule-

News

Notes From Justin - Jan 17th, 2002

First Update - Jan 9th, 2002
Here are the two updates that have been released by First so far: http://www.usfirst.org/robotics/doc_art3.htm

Notes From Justin - Jan 9th, 2002
Alrighty, here are notes for this week:

US First Kickoff!- Jan 5th, 2002
Go to http://www.usfirst.org/robotics/doc_updt.htm for the documents detailing the rules for this year's competition.

Notes from Justin - Jan 3rd, 2002

Notes from Justin - Dec 30th, 2001
Greetings once again. Happy New Year, I hope everyone had a very enjoyable
Holiday break and are prepared to start the FIRST competition season. Here
are some notes to remember:

Notes from Justin - Dec 13th, 2001
Next meeting is Thursday, December 20th at 1900 hours in the shop

Notes from Justin - Dec 6th, 2001
Lots of notes to go through here, sorry guys. I am trying to get these emails onto a regular schedule. I will try my best to send one out on Thursday night after the meeting and Wednesday a day before the next meeting. Here we go:

Upcoming Schedule
Dec 13th-Florida deposit due/Subgroup work
Dec 20th-Subgroup work
Jan 5th-FIRST Kickoff
Jan 6th-Local Kickoff

Important Information - Dec 5th, 2001
-Next meeting is Thursday, December 6th at 1900 hours in the shop
-I would like to congratulate Matt Haberland on being elected building Captain
-A $100 deposit will be due on December 13th for all those who are planning on going to Florida
-For those who have not sent them: I NEED home phone numbers, student id numbers, AOL instant messenger screennames, and what grade you are in, please EMAIL those things to me ASAP.
-There is now a month until the FIRST Kickoff, everyone make sure their calendars are empty for the month of January and most of February because you will be spending most of thier time working in the shop.
-I still do not have HOUR LOGS from the following people:
John Collins
David Lattibeaudiere
Erik Murad
-We (as a team) need to decided on a name for this years robot, so please be thinking avout that
-During December we are planning to break into subgroups to work on stuff we may need during the competition. PLEASE BE THINKING about what you would be interested in. The subgroup options are (but are not limited to):
pneumatics board
controls breadboard
mobility base improvements
gear boxes
motor mounts
-casting
-generic
torque transfer
elevator
claw/gripper
animation
chairman's award
Thank you and God bless.
-The Skipper
Upcoming Schedule
Dec 6th-Subgroup work
Dec 13th-Florida deposit due/Subgroup work
Dec 20th-Subgroup work
Jan 5th-FIRST Kickoff
Jan 6th-Local Kickoff


Uncle Milo Challenge - November 17th, 2001
The details of the Uncle Milo Challenge have been posted. You can access them here.

Notes - November 1st, 2001
The notes from the November 1st meeting have been posted. You can access them here.

Notes - October 25th, 2001
The notes from the October 25th meeting have been posted. You can access them here.

Notes - October 18th, 2001
Here are the notes from the meet on on October 18th, in MS Word format. They'll be available in the Members section shortly.

Schedule - October 1st, 2001
This is the schedule for the rest of the fall and early winter. It will be available in the Members section shortly.

Sept 20 Begin "Uncle Milo"
Sept 27

Finish "Uncle Milo"
Discussion about competitions

Oct 4

Introduction to Mr Tripp's "Rigged Competion"
Sign up for shop training
"drop dead date" to join team

Week of Oct 11 Continue with "Rigged Competition"
Oct 18 Shop Training
Oct 25 Complete "Rigged Competition"
Nov 1

Contest for "Rigged Competition"
get challenge for "Prototyping"
break into groups for "Prototyping"

Nov 8

Groups develop plans for "Prototype" competition
Home Depot supply
List due for "prototypes"

Nov 10 Saturday "Prototype" building session (8 hours)
Nov 15 Debug session for "Prototypes"
Nov 29

"Prototype" competition
break into subgroups

Dec 6 Subgroup work
Dec 13 Subgroup work
Dec 20 Subgroup work
Jan 5 FIRST Kick-Off
Jan 6 Local Kick-Off

First Update! - October 1st, 2001
This is the first news item on the website. It's just for cosmetic purposes, so I can make sure everything looks pretty, but hopefully there will be some real updates soon! Check back here often. If you're experiencing any problems with this website, or if you just don't like the way something looks, shoot me an e-mail at syph3r@home.com. Thanks for stopping by.

 

No Copyright. Feel free to use anything on this website for educational purposes.